It's been a long time since I last posted on this thread as the last few years have made it impossible to get any work done to my Series 1 or Fiesta Turbo. To give a brief recap of my misfortune I bought the wife a new car and we moved house down to Ayrshire. Shortly after moving I had an accident at work that left me sat at home for almost a full year with only statuary sick pay. After 11 months of sitting around I returned to work only to find my company was liquidated with no notice only 2 months later. I managed to get a new job fairly quickly but my new job is monthly pay with no where near as much overtime as the old job. It has taken me the last year and a bit to get back on my feet financially and get some savings back into the Series 1 fund which was raped repeatedly. I'm happy to report though that I've finally started working on the old Escort again although I've made a few key changes to my original plans.
After 5 years of the car sitting half stripped in various driveways I finally got round to stripping it completely lol. The front passenger footwell was soaking due to a leak on the bulkhead from under the old battery tray so the full interior was covered in mould. I wanted to put everything up into my loft in a ready to refit condition so that meant stripping the car piece by piece and deep cleaning everything.
After cleaning the full interior everything was tucked away in the loft and I turned my attention to prepping some parts that will be refitted to the car.
As you will notice the car will now NOT to be running 4x4 Cosworth running gear and I will be sticking with front wheel drive so I wanted to convert the rear brakes to disks. I had to buy a spare set of axle stubs and rear hub flanges as I need to keep my car rolling at the moment but as you can see the parts were in a very USED condition.
As will become apparent throughout this project I want everything to be New or as New as humanly possible so I set about cleaning up the scaby old hubs.
I then gave them 5 or 6 coats of acid etch primer front and back before several coats of Ford moondust silver
I already have a pair of NOS Front hub carriers and hubs and 4 new Ford wheel bearings along with a full set of AVO coilovers so I can now get all 4 legs built up ready to go on the shell once it's painted.
This is my new power plant and gear box setup
Decided to go with A Mk1 Focus RS engine and ST170 Getrag 6 Speed gearbox. The Gearbox has been completely rebuilt and the engine is over at PBS Engineering getting stripped down and rebuilt with all new gaskets, shells and some new piper cams.
That's my new single billet dual mass racing flywheel and clutch kit and my GT28 roller bearing Turbo
You know it's going to be good when you can fist the turbo